Project Location.

Client Challenges.

As part of the CON 904 Turnkey Framework, ESB required a competent  contractor for the delivery of 110 kV GIS substation at Kilnap. This project had tight timeframes for delivery which required effective and efficient project and stakeholder management.

Our Solution.

  • H&MV Engineering were responsible for the substation, 110 kV Gas Insulated switchgear, enabling works, civil works, electrical plant, secondary and ancillary systems, testing and commissioning, High Voltage cables and ducting
  • A full 3D model of the station is being prepared as part of the design the Engineering, Procurement and Construction delivery of the Kilnap rocess.
  • H&MV Engineering were responsible for safety & risk management throughout the project lifecycle and produced a complete set of civil and electrical as-built drawings and handover file. Responsible for issuing the Integrated Test Plans (ITPs), Construction Management Plans, Quality Plans, Safety Management Plan and Temporary Works Register.

Similar Projects.

Ready to start your Utility Infrastructure Project?