380/20 kV Data Centre

Case Study:

Project Location.

Client Challenges.

Connection of a 350 MW data centre at 380 kV to the grid in Berlin. The client required a competent contractor for design, construction, commissioning, and handover, as well as liaison with the local municipal and 50 hertz.

Our Solution.

  • H&MV Engineering’s scope of works includes the complete engineering & design phase, procurement of equipment, including LLEs completed through a PCSA, and on-site construction, commissioning and handover to the client.
  • The new 380/30 kV substation includes 380kV GIS equipment and associated primary and secondary equipment.
  • H&MV is also responsible for the civil construction of the GIS building, including the control, metering, and auxiliaries rooms, transformer bunds, and 30 kV modular buildings.
  • Liaison and communication, as well as early engagement with the client through the PCSA and utility, was of paramount importance to the delivery of this project.

Similar Projects.

Ready to start your Data Centre Project?